
HSL investigation refutes asbestos claims over safe cement
The Health and Safety Laboratory (HSL) have investigated claims that chrysotile in asbestos cement changes into a non-asbestos fibrous material called Casitile. The claims also suggested that this process is 100% efficient and no chrysotile asbestos remains in the matrix and no release of airborne chrysotile fibres can occur.
more »
Operations and Maintenance Program (OMP)
A program of work practices to maintain friable ACBM in good condition, ensure clean up of asbestos fibres previously released, and prevent further release by minimizing and controlling friable ACBM disturbance or damage.
Outside Air
The air outside buildings and structures, including, but not limited to, the air under a bridge or in an open air ferry dock.